New housing construction in Capitol Hill, Seattle: every permit and application, units completed and under construction, mapped by site.

Weekly recap Back to map Stats/About

Neighborhoods

Capitol Hill

2020: 133 permitted, 1,035 applied, 333 completed2021: 318 permitted, 61 applied, 947 completed2022: 333 permitted, 37 applied, 215 completed2023: 96 permitted, 132 applied, 184 completed2024: 179 permitted, 17 applied, 491 completed2025: 17 permitted, 191 applied, 131 completed2026: 96 permitted, 10 applied, 49 completed
Under construction 177
Jan 2020: 1,477 under constructionFeb 2020: 1,468 under constructionMar 2020: 1,380 under constructionApr 2020: 1,382 under constructionMay 2020: 1,380 under constructionJun 2020: 1,368 under constructionJul 2020: 1,334 under constructionAug 2020: 1,320 under constructionSep 2020: 1,273 under constructionOct 2020: 1,273 under constructionNov 2020: 1,360 under constructionDec 2020: 1,270 under constructionJan 2021: 1,259 under constructionFeb 2021: 1,251 under constructionMar 2021: 1,252 under constructionApr 2021: 1,172 under constructionMay 2021: 1,081 under constructionJun 2021: 882 under constructionJul 2021: 743 under constructionAug 2021: 852 under constructionSep 2021: 851 under constructionOct 2021: 743 under constructionNov 2021: 774 under constructionDec 2021: 641 under constructionJan 2022: 644 under constructionFeb 2022: 636 under constructionMar 2022: 630 under constructionApr 2022: 623 under constructionMay 2022: 624 under constructionJun 2022: 688 under constructionJul 2022: 858 under constructionAug 2022: 859 under constructionSep 2022: 867 under constructionOct 2022: 696 under constructionNov 2022: 764 under constructionDec 2022: 755 under constructionJan 2023: 749 under constructionFeb 2023: 742 under constructionMar 2023: 748 under constructionApr 2023: 748 under constructionMay 2023: 762 under constructionJun 2023: 759 under constructionJul 2023: 759 under constructionAug 2023: 758 under constructionSep 2023: 758 under constructionOct 2023: 782 under constructionNov 2023: 774 under constructionDec 2023: 638 under constructionJan 2024: 643 under constructionFeb 2024: 636 under constructionMar 2024: 721 under constructionApr 2024: 685 under constructionMay 2024: 686 under constructionJun 2024: 685 under constructionJul 2024: 555 under constructionAug 2024: 385 under constructionSep 2024: 347 under constructionOct 2024: 347 under constructionNov 2024: 256 under constructionDec 2024: 248 under constructionJan 2025: 246 under constructionFeb 2025: 178 under constructionMar 2025: 179 under constructionApr 2025: 177 under constructionMay 2025: 170 under constructionJun 2025: 153 under constructionJul 2025: 150 under constructionAug 2025: 138 under constructionSep 2025: 140 under constructionOct 2025: 140 under constructionNov 2025: 134 under constructionDec 2025: 134 under constructionJan 2026: 134 under constructionFeb 2026: 134 under constructionMar 2026: 143 under constructionApr 2026: 147 under constructionMay 2026: 133 under constructionJun 2026: 203 under constructionJul 2026: 203 under constructionAug 2026: 201 under constructionSep 2026: 177 under constructionOct 2026: 177 under constructionNov 2026: 177 under construction
Housing projects in Capitol Hill status

Projects in Capitol Hill

Under construction 9 addresses, 177 units

1534 Broadway
1534 Broadway 85 apartments in Capitol Hill, applied in June 2023, under construction since March 2025, 3/4 construction milestones passed, last milestone passed October 15, 2026.
228 11th Ave E
228 11th Ave E 70 apartments in Capitol Hill, applied in May 2020, under construction since July 2026, 1/4 construction milestones passed, last milestone passed July 20, 2026.
1312 E Olive St
1312 E Olive St 9 townhomes in Capitol Hill, applied in July 2023, under construction since April 2026, 4/4 construction milestones passed, last milestone passed October 13, 2026.
1822 14th Ave
1822 14th Ave 6 townhomes in Capitol Hill, applied in June 2022, under construction since July 2024, 4/4 construction milestones passed, last milestone passed November 10, 2025.
904 E Highland Dr
904 E Highland Dr 2 duplex homes in Capitol Hill, applied in November 2019, under construction since May 2026, 2/4 construction milestones passed, last milestone passed September 18, 2026.

Applied 40 addresses, 1,541 units

1410 E John St
1410 E John St 337 apartments in Capitol Hill, applied in July 2020, corrections requested in May 2025.
112 10th Ave E
112 10th Ave E 221 apartments in Capitol Hill, applied in May 2025, last activity in June 2025.
1661 E Olive Way
1661 E Olive Way 160 apartments in Capitol Hill, applied in March 2023, corrections requested in November 2026.
1710 12th Ave
1710 12th Ave 134 apartments in Capitol Hill, applied in April 2017, last activity in October 2025.
600 Broadway E
600 Broadway E 122 apartments in Capitol Hill, applied in October 2023, corrections requested in April 2025.
1722 Bellevue Ave
1722 Bellevue Ave 98 apartments in Capitol Hill, applied in September 2020, withdrawn in October 2026.
1806 12th Ave
1806 12th Ave 94 apartments in Capitol Hill, applied in July 2025, no activity since.
1013 E Republican St
1013 E Republican St 75 apartments in Capitol Hill, applied in October 2019, last activity in July 2025.
422 11th Ave E
422 11th Ave E 56 apartments in Capitol Hill, applied in July 2025, no activity since.
310 11th Ave E
310 11th Ave E 35 apartments in Capitol Hill, applied in March 2020, last activity in March 2026.
1208 Pine St
1208 Pine St 30 apartments in Capitol Hill, applied in January 2026, no activity since.
713 E Olive St
713 E Olive St 25 apartments in Capitol Hill, applied in March 2025, no activity since.
1014 E John St
1014 E John St 22 apartments in Capitol Hill, applied in September 2021, corrections requested in June 2026.
1016 Bellevue Ct E9 townhomes in Capitol Hill, applied in February 2018, corrections requested in November 2026. 915 E Prospect St8 townhomes in Capitol Hill, applied in February 2025, last activity in September 2026. 609 Federal Ave E8 townhomes in Capitol Hill, applied in September 2018, corrections requested in April 2026. 949 A 10th Ave E6 townhomes in Capitol Hill, applied in March 2025, last activity in September 2026. 300 11th Ave E6 townhomes in Capitol Hill, applied in December 2020, permit issued in August 2026. 1014 E Mercer St5 townhomes in Capitol Hill, applied in September 2018, corrections requested in April 2026. 1626 Lakeview Blvd E4 townhomes in Capitol Hill, applied in March 2025, last activity in August 2025. 946 Broadway E4 apartments in Capitol Hill, applied in April 2025, no activity since. 619 Malden Ave E4 units (2 houses, 2 attached ADUs) in Capitol Hill, applied in December 2020, last activity in May 2024. 116 13th Ave E3 apartments in Capitol Hill, applied in July 2025, permit issued in April 2026. 221 Belmont Ave E3 apartments in Capitol Hill, applied in October 2021, last activity in January 2026. 1627 Belmont Ave2 duplex homes in Capitol Hill, applied in July 2026, no activity since. 1728 12th Ave2 apartments in Capitol Hill, applied in July 2026, no activity since. 200 10th Ave E2 apartments in Capitol Hill, applied in May 2026, no activity since. 213 11th Ave E2 houses in Capitol Hill, applied in October 2025, no activity since. 1014 Lakeview Blvd E1 townhome in Capitol Hill, applied in November 2026. 109 11th Ave E1 attached ADU in Capitol Hill, applied in September 2026. 711 E Aloha St1 unit in Capitol Hill, applied in August 2026, no activity since. 1436 E Ward St1 unit in Capitol Hill, applied in June 2026, no activity since. 745 10th Ave E1 house in Capitol Hill, applied in May 2026, last activity in June 2026. 314 E Mercer St1 apartment in Capitol Hill, applied in December 2025, permit issued in June 2026. 739 Broadway E1 unit in Capitol Hill, applied in June 2023, last activity in November 2025. 728 12th Ave E1 house in Capitol Hill, applied in October 2025, no activity since. 912 12 Ave E1 attached ADU in Capitol Hill, applied in March 2025, no activity since. 805 14th Ave E1 house in Capitol Hill, applied in June 2019, expired in December 2024.

Completed 155 addresses, 4,971 units

714 E Pike St
714 E Pike St 257 apartments in Capitol Hill, 7 stories, applied in August 2012, completed in January 2016.
600 E Pike St
600 E Pike St 249 apartments in Capitol Hill, 7 stories, applied in April 2013, completed in March 2016.
301 E Pine St
301 E Pine St 211 apartments in Capitol Hill, 9 stories, applied in September 2012, completed in March 2017.
1427 11th Ave
1427 11th Ave 135 apartments in Capitol Hill, 6 stories, applied in March 2014, completed in September 2016.
1519 Minor Ave
1519 Minor Ave 120 units in Capitol Hill, applied in November 2011, completed in June 2013.
1515 Broadway
1515 Broadway 118 apartments in Capitol Hill, 8 stories, applied in May 2018, completed in December 2023.
923 E John St
923 E John St 110 apartments in Capitol Hill, 7 stories, applied in March 2017, completed in March 2020.
1515 14th Ave
1515 14th Ave 108 apartments in Capitol Hill, applied in January 2012, completed in September 2014.
1830 Broadway
1830 Broadway 94 apartments in Capitol Hill, 8 stories, applied in March 2017, completed in July 2021.
800 E Denny Way
800 E Denny Way 93 apartments in Capitol Hill, applied in March 2018, completed in October 2022.
421 Belmont Ave E
421 Belmont Ave E 91 apartments in Capitol Hill, 9 stories, applied in April 2019, completed in November 2024.
1717 Belmont Ave
1717 Belmont Ave 90 apartments in Capitol Hill, 7 stories, applied in April 2018, completed in December 2020.
722 E Pike St
722 E Pike StPike Flats 90 apartments in Capitol Hill, 7 stories, applied in November 2015, completed in December 2018.
721 E Pine St
721 E Pine St 90 apartments in Capitol Hill, 7 stories, applied in January 2013, completed in October 2015.
1200 E Pike St
1200 E Pike St 88 apartments in Capitol Hill, 6 stories, applied in May 2013, completed in December 2017.
1620 12th Ave
1620 12th Ave 88 apartments in Capitol Hill, 6 stories, applied in January 2012, completed in October 2014.
1634 11th Ave
1634 11th Ave 80 apartments in Capitol Hill, 6 stories, applied in August 2015, completed in May 2018.
1320 E Pine St
1320 E Pine St 79 apartments in Capitol Hill, 4 stories, applied in January 2018, completed in July 2024.
200 Belmont Ave E
200 Belmont Ave E 78 apartments in Capitol Hill, 7 stories, applied in November 2009, completed in January 2015.
123 10th Ave E
123 10th Ave E 74 apartments in Capitol Hill, 8 stories, applied in February 2017, completed in April 2021.
1420 E Madison St
1420 E Madison St 74 apartments in Capitol Hill, 6 stories, applied in August 2014, completed in October 2018.
515 Harvard Ave E
515 Harvard Ave E 73 apartments in Capitol Hill, 7 stories, applied in June 2013, completed in November 2015.
225 Harvard Ave E
225 Harvard Ave E 71 apartments in Capitol Hill, 8 stories, applied in February 2018, completed in October 2022.
500 Belmont Ave E
500 Belmont Ave E 71 apartments in Capitol Hill, 7 stories, applied in June 2011, completed in March 2014.
802 E Thomas St
802 E Thomas St 70 apartments in Capitol Hill, 7 stories, applied in December 2010, completed in October 2018.
1145 10th Ave E
1145 10th Ave E 70 apartments in Capitol Hill, applied in January 2012, completed in April 2014.
523 15th Ave E
523 15th Ave E 68 apartments in Capitol Hill, 5 stories, applied in January 2019, completed in February 2025.
736 Bellevue Pl E
736 Bellevue Pl E 61 apartments in Capitol Hill, 5 stories, applied in March 2017, completed in June 2021.
711 Bellevue Ave E
711 Bellevue Ave E 61 apartments in Capitol Hill, 6 stories, applied in January 2010, completed in February 2013.
420 Boylston Ave E
420 Boylston Ave E 60 apartments in Capitol Hill, 7 stories, applied in August 2018, completed in December 2021.
514 Federal Ave E
514 Federal Ave EPlaid 58 apartments in Capitol Hill, 5 stories, applied in July 2018, completed in July 2024.
1420 E Howell St
1420 E Howell St 57 apartments in Capitol Hill, 5 stories, applied in September 2014, completed in February 2018.
1820 Boylston Ave
1820 Boylston Ave 55 apartments in Capitol Hill, 8 stories, applied in October 2015, completed in February 2019.
121 12th Ave E
121 12th Ave E 51 apartments in Capitol Hill, 5 stories, applied in November 2014, completed in March 2019.
120 10th Ave E
120 10th Ave E 49 apartments in Capitol Hill, 4 stories, applied in June 2015, completed in August 2018.
403 Belmont Ave E
403 Belmont Ave E 47 apartments in Capitol Hill, 7 stories, applied in April 2015, completed in August 2017.
323 Bellevue Ave E
323 Bellevue Ave EOslo 45 apartments in Capitol Hill, 6 stories, applied in August 2015, completed in July 2021.
1300 E Pike St
1300 E Pike StSolis 45 apartments in Capitol Hill, applied in July 2016, completed in September 2020.
1728 Summit Ave
1728 Summit AveBrava 41 apartments in Capitol Hill, 6 stories, applied in August 2012, completed in October 2021.
1202 E Thomas St
1202 E Thomas St 41 apartments in Capitol Hill, 4 stories, applied in September 2015, completed in March 2019.
741 Harvard Ave E
741 Harvard Ave E 41 apartments in Capitol Hill, 5 stories, applied in April 2015, completed in March 2018.
1010 E Republican St
1010 E Republican St 36 apartments in Capitol Hill, 5 stories, applied in January 2015, completed in April 2024.
506 10th Ave E
506 10th Ave E 36 apartments in Capitol Hill, 5 stories, applied in May 2016, completed in December 2021.
750 11th Ave E
750 11th Ave E 34 apartments in Capitol Hill, 5 stories, applied in January 2015, completed in October 2018.
1715 12th Ave
1715 12th Ave 34 apartments in Capitol Hill, 4 stories, applied in July 2015, completed in April 2018.
525 Federal Ave E
525 Federal Ave E 29 apartments in Capitol Hill, 4 stories, applied in March 2017, completed in July 2020.
1410 E Howell St
1410 E Howell St 24 apartments in Capitol Hill, 5 stories, applied in September 2021, completed in September 2026.
416 Summit Ave E
416 Summit Ave E 21 apartments in Capitol Hill, 3 stories, applied in February 2016, completed in February 2018.
714 10th Ave E
714 10th Ave E 20 apartments in Capitol Hill, 5 stories, applied in December 2016, completed in December 2023.
1627 14th Ave
1627 14th Ave 17 apartments in Capitol Hill, 4 stories, applied in March 2019, completed in June 2025.
1417 E Howell St
1417 E Howell St 15 townhomes in Capitol Hill, applied in September 2016, completed in December 2022.
410 11th Ave E
410 11th Ave E 13 apartments in Capitol Hill, 5 stories, applied in March 2020, completed in February 2023.
1225 E Roy St
1225 E Roy St 12 townhomes in Capitol Hill, applied in April 2019, completed in August 2025.
1714 14th Ave
1714 14th Ave 12 houses in Capitol Hill, 3 stories, applied in September 2015, completed in August 2018.
925 10th Ave E9 units (4 duplex homes, 5 townhomes) in Capitol Hill, applied in September 2016, completed in February 2020. 316 13th Ave E9 apartments in Capitol Hill, 4 stories, applied in March 2017, completed in April 2019. 1515 Lakeview Blvd E9 townhomes in Capitol Hill, applied in January 2016, completed in January 2018. 222 10th Ave E8 townhomes in Capitol Hill, applied in June 2022, completed in December 2024. 1827 14th Ave8 townhomes in Capitol Hill, applied in September 2021, completed in November 2023. 1715 14th Ave8 units (2 duplex homes, 6 townhomes) in Capitol Hill, applied in September 2018, completed in September 2022. 712 11th Ave E8 townhomes in Capitol Hill, applied in November 2018, completed in February 2022. 1052 E Harrison St8 townhomes in Capitol Hill, applied in February 2018, completed in February 2021. 304 10th Ave E8 apartments in Capitol Hill, 4 stories, applied in October 2017, completed in May 2020. 410 10th Ave E8 duplex homes in Capitol Hill, applied in December 2016, completed in December 2018. 732 Belmont Pl E8 townhomes in Capitol Hill, applied in March 2016, completed in August 2018. 711 Federal Ave E8 townhomes in Capitol Hill, applied in June 2016, completed in October 2017. 735 Broadway E8 apartments in Capitol Hill, 4 stories, applied in June 2015, completed in October 2017. 1803 13th Ave8 townhomes in Capitol Hill, applied in October 2015, completed in July 2017. 1020 E John St7 units (1 house, 6 townhomes) in Capitol Hill, applied in February 2021, completed in May 2025. 1831 14th Ave7 townhomes in Capitol Hill, applied in May 2018, completed in April 2022. 1724 11th Ave7 townhomes in Capitol Hill, applied in June 2017, completed in August 2020. 735 10th Ave E7 apartments in Capitol Hill, 4 stories, applied in January 2016, completed in May 2018. 318 Bellevue Ave E6 townhomes in Capitol Hill, applied in August 2017, completed in November 2025. 505 11th Ave E6 townhomes in Capitol Hill, applied in February 2020, completed in January 2025. 728 Broadway E6 townhomes in Capitol Hill, applied in December 2022, completed in January 2025. 218 10th Ave E6 townhomes in Capitol Hill, applied in September 2021, completed in February 2024. 1419 E Howell St6 townhomes in Capitol Hill, applied in February 2018, completed in May 2023. 321 Malden Ave E6 townhomes in Capitol Hill, applied in June 2018, completed in August 2021. 926/930 Broadway E6 units (1 house, 5 townhomes) in Capitol Hill, applied in September 2018, completed in January 2023. 627 13th Ave E6 townhomes in Capitol Hill, applied in July 2022, completed in October 2026. 418 10th Ave E6 townhomes in Capitol Hill, applied in January 2018, completed in June 2020. 216 10th Ave E6 townhomes in Capitol Hill, applied in December 2018, completed in May 2022. 714 11th Ave E6 units (2 duplex homes, 4 townhomes) in Capitol Hill, applied in June 2018, completed in March 2022. 1111 E Howell St6 townhomes in Capitol Hill, applied in September 2017, completed in July 2019. 319 Malden Ave E6 townhomes in Capitol Hill, applied in August 2018, completed in April 2021. 1006 E Mercer St6 houses in Capitol Hill, applied in September 2017, completed in November 2020. 511 11th Ave E6 units (2 duplex homes, 4 townhomes) in Capitol Hill, applied in December 2017, completed in August 2020. 422 10th Ave E6 townhomes in Capitol Hill, applied in December 2017, completed in June 2020. 764 Belmont Pl E6 townhomes in Capitol Hill, applied in May 2018, completed in December 2019. 622 10th Ave E6 duplex homes in Capitol Hill, applied in June 2017, completed in August 2019. 620 10th Ave E6 townhomes in Capitol Hill, applied in July 2018, completed in August 2019. 410 Federal Ave E6 townhomes in Capitol Hill, applied in September 2015, completed in May 2018. 1623 14th Ave6 units (1 house, 2 duplex homes, 3 townhomes) in Capitol Hill, applied in April 2016, completed in December 2016. 1127 10th Ave E5 units (2 duplex homes, 3 townhomes) in Capitol Hill, applied in March 2024, completed in May 2026. 1121 10th Ave E5 units (2 duplex homes, 3 townhomes) in Capitol Hill, applied in March 2024, completed in May 2026. 1116 Broadway E5 units (2 duplex homes, 3 townhomes) in Capitol Hill, applied in August 2017, completed in October 2019. 530 12th Ave E5 townhomes in Capitol Hill, applied in June 2018, completed in June 2021. 516 Bellevue Ave E5 apartments in Capitol Hill, applied in October 2014, completed in July 2020. 403 13th Ave E5 apartments in Capitol Hill, 4 stories, applied in December 2016, completed in December 2019. 515 E Denny Way5 apartments in Capitol Hill, 3 stories, applied in January 2016, completed in September 2019. 1816 14th Ave5 units (2 duplex homes, 3 townhomes) in Capitol Hill, applied in May 2016, completed in September 2017. 1122 Broadway E5 apartments in Capitol Hill, 3 stories, applied in August 2016, completed in September 2016. 1315 E Denny Way4 townhomes in Capitol Hill, applied in May 2024, completed in May 2026. 1631 Boylston Ave4 apartments in Capitol Hill, 3 stories, applied in November 2020, completed in February 2025. 207 10th Ave E4 apartments (27 bedrooms) in Capitol Hill, 4 stories, applied in February 2018, completed in December 2023. 615 15th Ave E4 duplex homes in Capitol Hill, applied in June 2018, completed in January 2021. 422 14th Ave E4 duplex homes in Capitol Hill, applied in March 2021, completed in May 2023. 940 Broadway E4 units (1 house, 3 townhomes) in Capitol Hill, applied in April 2018, completed in January 2021. 420 13th Ave E4 apartments in Capitol Hill, 3 stories, applied in November 2017, completed in June 2019. 411 Harvard Ave E4 apartments in Capitol Hill, 4 stories, applied in January 2017, completed in March 2019. 1138 10th Ave E4 duplex homes in Capitol Hill, applied in November 2015, completed in October 2018. 1635 15th Ave4 townhomes in Capitol Hill, applied in December 2016, completed in July 2018. 602 12th Ave E4 apartments in Capitol Hill, 4 stories, applied in June 2016, completed in July 2018. 614 14th Ave E4 duplex homes in Capitol Hill, applied in March 2016, completed in December 2017. 503 12th Ave E3 units (1 house, 2 attached ADUs) in Capitol Hill, 3 stories, applied in December 2021, completed in July 2025. 717 Belmont Pl E3 units (1 house, 2 duplex homes) in Capitol Hill, applied in July 2019, completed in January 2024. 920 Broadway E3 houses in Capitol Hill, applied in September 2017, completed in September 2019. 1730 11th Ave3 townhomes in Capitol Hill, applied in October 2018, completed in August 2021. 625 Malden Ave E3 apartments in Capitol Hill, 3 stories, applied in June 2016, completed in January 2021. 619 15th Ave E3 units (1 house, 2 duplex homes) in Capitol Hill, applied in June 2018, completed in September 2020. 1019 E Pike St3 apartments in Capitol Hill, 3 stories, applied in October 2016, completed in May 2018. 1124 Lakeview Blvd E2 units (1 attached ADU, 1 detached ADU) in Capitol Hill, applied in June 2025, completed in August 2026. 716 12th Ave E2 units (1 attached ADU, 1 detached ADU) in Capitol Hill, applied in April 2021, completed in January 2026. 1418 E Olive St2 units (1 house, 1 detached ADU) in Capitol Hill, applied in October 2021, completed in August 2024. 744 Belmont Pl E2 apartments in Capitol Hill, 4 stories, applied in October 2018, completed in June 2023. 425 Summit Ave E2 apartments in Capitol Hill, 3 stories, applied in October 2018, completed in May 2021. 1118 Broadway E2 duplex homes in Capitol Hill, applied in October 2018, completed in October 2019. 521 Malden Ave E2 units (1 house, 1 attached ADU) in Capitol Hill, 2.5 stories, applied in October 2015, completed in September 2017. 1700 Summit Ave2 apartments in Capitol Hill, 3 stories, applied in November 2015, completed in February 2017. 934 10th Ave E1 house in Capitol Hill, 2 stories, applied in November 2021, completed in May 2026. 318 E Mercer St1 attached ADU in Capitol Hill, applied in November 2024, completed in April 2025. 702 12th Ave E1 attached ADU in Capitol Hill, applied in January 2024, completed in April 2025. 1511 Federal Ave E1 detached ADU in Capitol Hill, applied in July 2021, completed in June 2024. 1655 10th Ave E1 attached ADU in Capitol Hill, applied in December 2021, completed in February 2024. 1139 Federal Ave E1 detached ADU in Capitol Hill, applied in November 2019, completed in August 2023. 1310 E Thomas St1 apartment in Capitol Hill, 3 stories, applied in November 2021, completed in June 2023. 519 12th Ave E1 apartment in Capitol Hill, 1.5 stories, applied in December 2017, completed in February 2023. 931 12th Ave E1 detached ADU in Capitol Hill, applied in November 2020, completed in January 2022. 105 Harvard Ave E1 duplex home in Capitol Hill, 4 stories, applied in March 2017, completed in December 2021. 931 11th Ave E1 apartment in Capitol Hill, 4 stories, applied in August 2018, completed in October 2021. 723 13th Ave E1 attached ADU in Capitol Hill, applied in November 2020, completed in September 2021. 418 E Loretta Pl1 apartment in Capitol Hill, applied in May 2018, completed in August 2020. 1131 Federal Ave E1 house in Capitol Hill, 2 stories, applied in December 2017, completed in March 2020. 741 Federal Ave E1 apartment in Capitol Hill, 2 stories, applied in June 2018, completed in January 2020. 811 E Boston St1 house in Capitol Hill, 2 stories, applied in October 2016, completed in July 2018. 1833 13th Ave1 apartment in Capitol Hill, 4 stories, applied in September 2015, completed in December 2017. 1422 E Aloha St1 attached ADU in Capitol Hill, applied in June 2017, completed in October 2017. 1722 Summit Ave1 apartment in Capitol Hill, applied in August 2015, completed in August 2017.